Planning Workbench
Portfolio model comparison
Compare reference allocations under one transparent set of hypothetical shocks, spending and fee assumptions.
Same assumptions, different references.
Each row uses the shocks, portfolio amount, spending and fee above.
| Reference | Asset shock | After spending & fee | Starting cash runway |
|---|
The arithmetic
Weighted shock = sum of each allocation weight multiplied by its asset shock. Ending value = shocked portfolio minus annual spending minus the fee on starting value, floored at zero. A zero residual does not represent solvency or an available funding facility.
The decision
The reference with the smallest loss in a chosen scenario is not necessarily the best portfolio. Examine multiple scenarios, liquidity needs, outside exposures and the limitations of the model.